Print Page   |   Contact Us   |   Sign In   |   Join
IAEI Magazine | Author: Paul W. Abernathy
Share |

Paul W. Abernathy

Paul W. Abernathy, a NEC columnist and consultant, holds both ICC and IAEI certifications as electrical inspector and electrical plans examiner. He has been NEC code consultant for the 1999, 2002, 2005 and 2008 editions. Mr. Abernathy has been active in the electrical industry since 1988; he presently is the electrical plans examiner for the city of Richmond, VA. He can be contacted at www.TheElectricalGuru.com.


Articles

The Peninsular Project

Requirements for the correct location and placement of a receptacle on a peninsular are found in Article 210, Part III. It is more specifically found in subsection 210.52(C)(3).
NOVEMBER-DECEMBER 2009