You are here: Home » Features
Features
Section 12 of the Canadian Electrical Code covering Wiring Methods has seen nineteen rule changes and seven new rules for the 2012 CE Code. The first revision is to change the size of the sand cover used for direct buried conductors or cables from 6 mm to screened sand with a maximum particle size of 4.75 mm in Subrule 12-012(4). The reason for the change was to recognise standard sieve sizes detailed in ASTM Standard D 2487.
With the pressure of a depressed economy, knowledgeable contractors are seeing more and more work going to electricians who are working outside their areas of expertise. If you have found a good answer to this problem, we need to hear it. Two readers of my Residential Wiring column at Electrical Contractor contacted me within the last year, worried about incompetent, bottom-bidder work. Both talked about the special knowledge needed to deal with smaller and older wiring systems (and both granted permission to share their thoughts).
A new survey by the Institute for Electric Efficiency (IEE) shows that as of September 2011, electric utilities have installed 27 million of the new smart meters. This equals more than 22 percent of all U.S. households. By 2015, it is projected that approximately 65 million smart meters will be installed, representing 54 percent of all homes in the country.
As your 84th International President, representative from the Southern Section and the first from the great state of Alabama, I recognize that I am only one of many. Many of whom came before me with great vision and enthusiasm which I can only hope to emulate. Even after saying that, we all must recognize that we are but one member of this great organization (IAEI) so we must focus on what is best for the organization as a whole.
The following questions and answers result from some of the more common situations that many inspectors face throughout their working day when seeing a new PV installation or reviewing a set of plans for a PV system. The questions are simplified versions of questions I receive in e-mails and from questioned plan sets as well as sometimes long, involved phone calls.
Part II of Article 210 deals with Branch-Circuit Ratings, starting with conductor sizing. These are some pretty basic rules so we will just cover the highlights here.
Who, then, are our future electricians, and where are they coming from? Who will train them, and what kind of training will they receive? Will there be a shortage of electricians and apprentices in the workplace? These are all questions I have been asked and have asked myself.
Collaboration separates excellence from mediocrity. Whether it is two people in adjacent offices or an entire city electrical inspection department, if the people involved are unwilling to collaborate, they will produce mediocre results.
At the International Association Electrical Inspectors Southern Section’s 2011 annual meeting it was my pleasure and honor to present the prestigious Gold Roadrunner Award to Chuck Mello and to Mark Ode, with the assistance of John Minick and Mark Earley, the two most recent recipients’ of this award.
When you were in school, you had to concentrate on your studies. When you began your career, you had to concentrate on your work. In fact, in just about every endeavor in life, concentration is essential for success. However, as an investor, you may find that you actually don’t want to concentrate too much.