|
|
Sign In | Register Now Why Register? |
||
|
|
|||
|
|
|||
|
IAEI News>Issue Listing>March/April 2002 >Other Code—The 2002 NESC Strength and Loading $$
The most significant change to the 2002 National Electrical Safety Code (NESC) is in the strength and loading requirements for aerial electric distribution and transmission facilities. Supporting structures and their supported facilities shall be designed to withstand extreme wind loading and a combination of ice and wind loading. Loading Districts Extreme Wind Loading 1997 NESC wind pressure in pounds = 0.00256 x V2 x shape factor x projected area V was the basic wind speed at 33 feet above ground from the map of the USA in Figure 250-2. The wind speeds in Figure 250-2 ranged from 70 to 110 miles-per-hour depending upon the location. When calculating wind loading on parts of the structure located higher off the ground than 33 feet, the wind speeds had to be increased appropriately. Shape factor was 1.0 for cylindrical elements like wire and round utility poles. The shape factor was 1.7 for flat surfaces. Shape factors for lattice structures were covered in Rule 252B2c. The projected area was the cross-sectional area of the element of the supporting structure or supported facility for which the loading was being calculated. 2002 NESC wind pressure in pounds = 0.00256 x V2 x kz x GRF x I x Cd x projected area V is now three-second-gust wind speed from Figure 250-2 (four pages of maps). The wind speeds range from 90 to 170 miles-per-hour depending upon the location. Kz is the velocity pressure exposure coefficient defined in Rule 250C1 and Table 250-2. For structures, kz varies from 0.92 to 1.40 depending upon structure overall height. For wire, kz varies from 1.0 to 1.50 depending upon the height of the wire above ground. GRF is the gust response factor from Table 250-3. For structures, GRF varies from 1.02 to 0.83 depending upon overall structure height. For wire, GRF varies from 0.63 to 0.93 depending upon span length and wire height above ground. I is importance factor. I is 1.0 for utility structures. Cd is the same shape factor as discussed earlier. The projected area is the same as discussed earlier. The significant difference between the 1997 and the 2002 codes is the difference in wind speeds. Since wind pressure is a function of the square of the wind speed, a small increase in wind speed results in a large increase in wind pressure. In some areas of the country, the wind speed has increased significantly. For example, in the coastal beach area of Delaware, we used to design our facilities for 90 mph wind. Under the new code, we now design our facilities for 115 mph wind. This 28 percent increase in wind speed results in a 63 percent increase in wind pressure. Some utilities estimate that this NESC change will result in a 50 percent increase in transmission line construction costs with very little increase in safety. In areas where transmission lines were not falling down due to extreme winds prior to 2002, increasing the strength will not improve safety.
If you have any general questions about the NESC, please write to me at dave.young@conectiv.com. National Electrical Safety Code and NESC are registered trademarks of the Institute of Electrical and Electronic Engineers (IEEE). Dave Young is a senior engineer with Conectiv Power Delivery of Wilmington, Delaware, where he has been working with and teaching the NESC for over 30 years. He is a member of the NESC Interpretations Subcommittee and an alternate on the NESC Overhead Lines Clearances Subcommittee 4. Dave is also vice-chairman of the Delmarva Division of the Chesapeake Chapter of the IAEI.
|
| ||||||||||||||||||||||||||||||||||||||||||||||||
Home
| Join | Advertising | Seminars | Contact
Us | Privacy
Statement | Legal
Notices |
||||||||||||||||||||||||||||||||||||||||||||||||||